- No Job costing or estimation
- Much easier design
- No anchor bolt or hold down coordination or installation
- No shortage or overages in material ordering
- No material cutting or welding
- No material staging
- No dependency on field framers’ interpretation of the working drawings
- 1/3 of the typical crew size
- 1/2 the framing schedule
- Lower liability and exposure
- Less dependency on highly experienced framers to erect the ABS system
- Faster delivery method to maximize field crew production