• No Job costing or estimation 
  • Much easier design
  • No anchor bolt or hold down coordination or installation
  • No shortage or overages in material ordering
  • No material cutting or welding
  • No material staging
  • No dependency on field framers’ interpretation of the working drawings
  • 1/3 of the typical crew size
  • 1/2 the framing schedule
  • Lower liability and exposure
  • Less dependency on highly experienced framers to erect the ABS system
  • Faster delivery method to maximize field crew production